Discussion topic: Fibre cable installation date

Reply
This message was authored by: Stirling

Fibre cable installation date

Please can you advise ,  I had a installation date on the 19th February but I have been  notified for the last 3 weeks that there are no engineers available,  but today I have been notified that there is a fault but no outreach engineers have even been to my property it was organised for the 19th Feb as its school half term and makes parking more accessible. It's extremely difficult and impossible to actually speak to a human !!

  Look forward for some help ,Please xx

 

Reply

All Replies

This message was authored by: Chrisee

Re: Fibre cable installation date

Posted by a Superuser, not a Sky employee. Find out more

@Stirling most of the preliminary work in running fibre does not require the engineers to have an appointment for a survey visit. If an issue is noticed the job may need extra work. Examples are of an expected run from a pole to your property is obstructed by a tree or a dig is required for an underground  run. In my own install a duct was thought to be blocked so a civils team was required delaying things for a couple of weeks. It can literally be anything. Openreach wont talk to you and it is unlikely Sky will be able to tell you much more if you call them.

 

Sorry to say you will have to be patient the job will be completed and you should be compensated for the delay see Customer Auto-Compensation | Sky Help | Sky.com

=========================================================
65inch Sky Glass, 3 Sky Streaming Pucks, Sky Ultrafast + and Sky SR213(white Wifi Max hub) main Wifi from 3 TP-Link Deco M4 units in access point mode
Avatar for Stirling
Level 1 icon
Topic Author
This message was authored by: Stirling

Re: Fibre cable installation date

Good Afternoon, Please can you advise if or when I will get my fibre upgrade ordered in January  activation date  was 19th February 2025

I receive weekly updates with the following reasons  with no updated date when or if fibre will be upgraded 

1. No engineers available 

2. Fault  has to be resolved 

3. No equipment in place 

I would just like an actual date of implementation. 

 

Thank you 

Stirling Matthews 