This discussion topic has been answered Discussion topic: Full fibre installation
- Subscribe to RSS Feed
- Mark Topic as New
- Mark Topic as Read
- Float this Topic for Current User
- Bookmark
- Subscribe
- Printer Friendly Page
Message posted on 17 Apr 2025 04:40 PM
- Mark as New
- Bookmark
- Subscribe
- Subscribe to RSS Feed
- Highlight
- Report post
I ordered full fibre 150 yesterday and have been given a date of 02/05/25 for installation, i assumed the engineer would run the new fibre cable from the pole opposite the house and connect it through the wall to the router but i have heard from another resident that they had to wait for Openreach to run the Fibre cable before the Sky engineer connected this to the router inside
can anyone tell me if this is the normal situation for Fibre install or will the engineer booked for the 02/05 be able to do the whole job and run the cable on the day
many thanks for any help
Best Answers
Message posted on 17 Apr 2025 04:44 PM - last edited: 17 Apr 2025 05:01 PM
- Mark as New
- Bookmark
- Subscribe
- Subscribe to RSS Feed
- Highlight
- Report post
@generater Have a look on the link below, you may have a one hit install, and OR Engineer can/will do it all at the same time, use your address check and just fill in the fields. Watch the video also.
Full Fibre Broadband Installation Guide | Openreach
- Subscribe to RSS Feed
- Mark Topic as New
- Mark Topic as Read
- Float this Topic for Current User
- Bookmark
- Subscribe
- Printer Friendly Page
All Replies
Message posted on 17 Apr 2025 04:44 PM - last edited: 17 Apr 2025 05:01 PM
- Mark as New
- Bookmark
- Subscribe
- Subscribe to RSS Feed
- Highlight
- Report post
@generater Have a look on the link below, you may have a one hit install, and OR Engineer can/will do it all at the same time, use your address check and just fill in the fields. Watch the video also.
Full Fibre Broadband Installation Guide | Openreach
Message posted on 17 Apr 2025 04:45 PM
- Mark as New
- Bookmark
- Subscribe
- Subscribe to RSS Feed
- Highlight
- Report post
Re: Full fibre installation
Openreach have to do the outside bit as they own that part of the network. This is usually done in advance of the authorised Sky installer who will be at your property on installation day.
Message posted on 17 Apr 2025 04:49 PM
- Mark as New
- Bookmark
- Subscribe
- Subscribe to RSS Feed
- Highlight
- Report post
Re: Full fibre installation
@Nigelb1972 OR own it all up to and including the ONT, if sky install the ONT, they are doing so in behave of OR...
Message posted on 17 Apr 2025 05:02 PM
- Mark as New
- Bookmark
- Subscribe
- Subscribe to RSS Feed
- Highlight
- Report post
Re: Full fibre installation
Thanks guys
am i right in thinking then that OR will run the cable and connect it to the outside box and Sky will then connect from this to the inside
Message posted on 17 Apr 2025 05:17 PM
- Mark as New
- Bookmark
- Subscribe
- Subscribe to RSS Feed
- Highlight
- Report post
Re: Full fibre installation
@generater yup...
Message posted on 17 May 2025 04:46 PM
- Mark as New
- Bookmark
- Subscribe
- Subscribe to RSS Feed
- Highlight
- Report post
Re: Full fibre installation
OR do it all.
Message posted on 17 May 2025 04:53 PM - last edited: 17 May 2025 04:53 PM
- Mark as New
- Bookmark
- Subscribe
- Subscribe to RSS Feed
- Highlight
- Report post
Re: Full fibre installation
In the majority of cases, yes, but ISPs have an increasing number of their own personnel doing CSP to ONT work, and Sky has some ladder-trained staff (naturally) who have been certified by Openreach to carry out overhead CBT to ONT connections.
What ISPs don't do is anything underground or in cabinets.
BT Halo 3+ Ultrafast FTTP (500Mbs), BT Smart Hub 2
- Subscribe to RSS Feed
- Mark Topic as New
- Mark Topic as Read
- Float this Topic for Current User
- Bookmark
- Subscribe
- Printer Friendly Page