Full Fibre installation delay

My Full fibre 300 installation was originally scheduled for 23rd April 2025 till now its not been activated .  Openreach is stating 3rd party permission required despite all the permissions are obtained . As this took long as an exception Sky gave me a temporary copper account so that i can have some sorts of internet in early August . Still waiting for full fibre to be activated , for OR to do the external dig work . Have anyone else is in the same sitiation as me ? 

 

OR engineer has done the survey and put a plan for Fibre to come to our property . Property is a bungalow so cannot be fed overhead . It is 40 m setback from the main road and accessed via a private road . All teh necessary permissions from neighbors are obtained . Its been more than 4 months since we are waiting for this work to be completed 