Fibre Activation Delay

 

I ordered fibre broadband two weeks ago and chose self-install since my home already has an Openreach fibre box. My activation was scheduled for today, but I just got a message saying it couldn’t go ahead because an engineer wasn’t able to complete it.

 

Customer service told me my order includes an engineer visit, even though I wasn’t given this option when ordering. They said the engineer needs to check the setup and provide a power cable for the Openreach box. Now, I have to wait another three weeks, meaning nearly six weeks total to get my service.

 

Is this normal? It feels like a long wait.

 